Place of Origin: | HEBEI, CHINA |
Brand Name: | LVJOE |
Certification: | ISO9001, SGS |
Model Number: | LVJOE20200317 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD260000 |
Packaging Details: | 40 HQ |
Delivery Time: | 90 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 8 sets per year |
Name: | Gypsum Machine | Capacity: | 30000-500000 Tons Per Year |
---|---|---|---|
Raw Material: | Natural Gypsum Rock Or FGD Gypsum | Finished Product: | Gypsum Powder For Building Material |
Aftersale Service: | Installation, Commissioning And Training |
Product Name:
Gypsum Powder Production Line for building gypsum board
Low price gypsum grinding mill/gypsum powder making machine for gypsum powder production line
Gypsum Powder Production Line
China building construction gypsum powder machine
Company Information:
industrial equipments. Our company has 300 workers, more than 80 sets of processing machines, including
2 sets of planer machines, one set of milling machine, 2 sets of boring machines, 50 sets of lathes and 3 sets
of PLC processing centers.In the last few years we have successfully developed many kinds of industrial equipment including gypsumboard production line, gypsum board lamination machine, gypsum powder production line, gypsum block production line, mineral wool board production line.
Product Information:
Gypsum powder production line works based on the following process:
The Crusher will break the big-size gypsum ore into small 25mm pieces, and then the small pieces will be sent to the grinder, after grinding fine, the qualified raw gypsum powder will be sent to boiling furnace to calcine, and the unqualified part will be sent to grinder until it's qualified. After calcining, the qualified gypsum powder will be sent to spiral conveyor through hoist.
The spiral conveyor will send the calcined gypsum powder to silo for storage, and cool the powder during the process. The dust remover is on the top of silo, the unqualified part will be sent to grinder until it's qualified.
The stored gypsum will be sent to product storage through steel impeller feeder, spiral conveyor, hoist, and send the qualified gypsum powder to storage or workshop finally.
The top pulse bag-type dust remover will collect dust from crusher, particle silo. When the dust and dust gas get into the dust remover through inlet, the big-size dust particle will fall because the increasing size and decreasing wind speed. The small dust particle will be filtered by filter bag. The filtered gas will be got rid of by outlet.
Production Capacity:
40, 000tons/year ---- 500, 000tons/year
Quality of Final Product:
Conformity with Chinese National Standard GB/T 9776-1988
Raw Materials:
Content of CaSO4 2H2O in gypsum mine >80%.
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
Fuel for Production:
Natural Gas, Oil or Coal
Main Parts of Equipment:
1. Ore Station
2. Crusher
3. Grinding System
4. Calcine Kiln
5. Exit System
6. Material Elevator
7. Silo
8. Entrance System
9. Coal/Natural Gas System
10. Dust Collector
11. Material Elevator
12. Aging Silo
Our Service:
1.Our company has professional installation & debug teams. We will install and debug the production line at the customers’ place until the equipment produces the qualified products.
2. We supply the accessories all the year round. The guarantee time of the equipment is one year.
3. We are responsible for the technical consultation and service all the year around and solve all kinds of technical problems at any time.
4. We can help the customer to do the consignment and the relevant procedure for import and export.
5. Our company will supply the information of the seller for all kinds of raw material and relevant information.
Warranty : Excellent easy broken parts support for buyers. Easy broken parts guarantee for one
year.
Trainning: The training is free of charge , and our engineer will be on duty to train your worker.
Installation&commissioning staff: 4-12 persons(adjustable according to the degree of automatic)