Place of Origin: | Hebei, China |
Brand Name: | LVJOE2020 |
Certification: | SGS, ISO9001,CE |
Model Number: | LVJOE202307 |
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD260000 per set |
Packaging Details: | 40 HQ and packages which are fit for long distance transportant |
Delivery Time: | 90 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 8 sets per year |
Name: | Plaster Production Line | Warranty: | 1 Year |
---|---|---|---|
After-sales Service: | Installation, Commissioning And Technical Support For Production | Factory Size: | 12m*24m |
Finished Product: | Gypsum Powder For Building Material | Mesh: | ≤100 |
Capacity: | 30000-500000 Tons Per Year |
Gypsum powder/Plaster production line works based on the following process:
The Crusher will break the big-size gypsum ore into small 25mm pieces, and then the small pieces will be sent to the grinder, after grinding fine, the qualified raw gypsum powder will be sent to boiling furnace to calcine, and the unqualified part will be sent to grinder until it's qualified. After calcining, the qualified gypsum powder will be sent to spiral conveyor through hoist.
The spiral conveyor will send the calcined gypsum powder to silo for storage, and cool the powder during the process. The dust remover is on the top of silo, the unqualified part will be sent to grinder until it's qualified.
The stored gypsum will be sent to product storage through steel impeller feeder, spiral conveyor, hoist, and send the qualified gypsum powder to storage or workshop finally.
The top pulse bag-type dust remover will collect dust from crusher, particle silo. When the dust and dust gas get into the dust remover through inlet, the big-size dust particle will fall because the increasing size and decreasing wind speed. The small dust particle will be filtered by filter bag. The filtered gas will be got rid of by outlet.
Production Capacity:
40, 000tons/year ---- 300, 000tons/year
Quality of Final Product:
Conformity with Chinese National Standard GB/T 9776-1988
Raw Materials:
Content of CaSO4 2H2O in gypsum mine >80%.
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
Fuel for Production:
Natural Gas, Oil or Coal
Main Parts of Equipment:
1. Ore Station
2. Crusher
3. Grinding System
4. Calcine Kiln
5. Exit System
6. Material Elevator
7. Silo
8. Entrance System
9. Coal/Natural Gas System
10. Dust Collector
11. Material Elevator
12. Aging Silo
some tools or small machines listed below:
Description | Model or Spec | Unit | Quantity | Remark |
Drilling machine | Set | 1 | ||
Sand wheel grinding machine | Set | 1 | ||
Power supply | 415V | set | 4 | |
Knife switch | 60A | Pcs | ||
Copper wire cable | m | As the need | Multiple strand, 3-cores |
|
Welding machine | set | 5 | ||
Welding electrode | Φ3.2 | carton | ||
Weld handle cable | m | 200 | ||
Welder electrical cable | pc | 8 | ||
Welder mask | pc | 8 | ||
Grinding wheel saw | set | 3 | ||
Bottled Oxygen gas | bottle | 2 | Spare one included | |
Bottled Acetylene gas | bottle | 2 | Spare one included | |
Oxygen Hoses | m | 200 |
|